Pull-arm garbage truck

Truk Hauman hook arm garbage truck

Product description

Place of Origin

SUIZHOU, CHINA

Brand Name

CLW

Certification

CCC, SGS, BV, DOT,  GCC

Model Number

CLW5120

Payment &  Shipping Terms

Minimum Order  Quantity

1

Unit Price

Negotiable

Packaging Details

naked,waxed,bulk  ship,ro-ro

Delivery Time

30-35 days

Payment Terms

L/C,  D/A, D/P, T/T, Western Union, MoneyGram

Supply Ability

500 Unit/Month

  Phone:+86 18808668855      
  ADD:Chengli Automobile Industry Park, Suizhou, Hubei, China

Product Details

Chassis configuration: 3650 wheelbase, 2.1-meter new single-row cab, Weichai 160 HP, 8-speed transmission, 8-ton rear axle, 232 double girder, 8.25R16 steel wire tire, electric doors and Windows, central lock, remote control key, aluminum alloy fuel tank, air conditioning, can go down to the basement


◇ Top configuration: strength alloy steel integrated main hook arm, reinforced secondary beam, cast steel tail wheel, hand integrated indoor and outdoor hydraulic control, reinforced top, telescopic arm, cylinder thicker, hydraulic leg, with construction trash can use, lifting capacity of 8000Kg. Hydraulic to complete the upper box + lower box + lock + self-unloading and other operations, to achieve a car with multiple boxes of circulation transfer.


Vehicle profile

The hook arm garbage truck, also known as the truck can be unloaded garbage truck, is mainly used for municipal sanitation, property management and other places to collect and carry all kinds of garbage, garbage compartment and chassis can be completely separated, with reasonable structure, simple operation, stability, high efficiency, good sealing performance, convenient dumping and other advantages, can realize a car and multiple garbage compartment joint operation, circular transportation, Fully improve the transport capacity of vehicles. Realize one car with multiple boxes cycle transfer, high efficiency, energy saving and cost saving.

Mode of operation

1. Driving operation: driving according to the general car driving method, the carriage should be returned to the initial position before driving, and the operation handle of the force extractor should be pushed apart (the electric control system will turn off the electromagnetic clutch power), so that the force extractor is in the stop working state.

2. Operation:

2.1 Dumpster hooking operation

Step 1 Pull up the handbrake handle in the cab to put the vehicle in the parking state.

Step 2 Pick up the electronic control box in the cab and first turn on the power switch on the box to make the power on and the electromagnetic clutch work (or combine the operation handle of the force extractor with the position); Then the "stretch" position of the hook arm knob on the control box does not let go, the main pull arm begins to work, the pull arm cylinder is extended, the main pull arm is rotated around the front hinge shaft of the flip flip frame, the pull arm is in the hook box position, the height of the pull arm hook is properly adjusted and aligned with the box bend hook, and the knob is released.

Step 3 Get out of the car and observe whether the lock handle at the lower end of the rear door of the garbage compartment is locked. If it is not locked, the lock handle should be pulled to ensure that the rear door of the garbage compartment is locked together with the garbage compartment.

Step 4 Observe whether the garbage input door of the garbage compartment is closed, and ensure that the garbage input door is locked, and ensure that the garbage input door is locked before entering the first step.

Step 5 When the hook hook of the draw-arm is aligned with the hook hook of the car body, twist the hook arm knob on the control box to the "shrink" position, the main draw-arm cylinder is recovered, the draw-arm hook hooks the hook hook of the car body, the garbage car begins to lift, and continue to hook the car.

Step 6 When the refuse body is placed on the subframe, release the hook arm knob of the box, twist the "lock" position of the compartment press and twist on the control box, and the lock cylinder is extended, and the main pull arm and the auxiliary pull arm are firmly locked together.

Step 7 Twist the power knob on the box to disconnect the electric control power supply (or switch the operation handle of the force extractor to separate the position);

maintenance

The garbage truck should be maintained in strict accordance with the regulations, so that the systems and devices are often in a good technical state, give full play to their efficiency, reduce fuel consumption, save expenses, and extend the service life of the garbage truck to a maximum extent.

(1) Chassis maintenance

The chassis shall strictly comply with the provisions of its operating instructions and carry out daily and weekly routine maintenance.

(2) Operation equipment maintenance

The maintenance of operating equipment is generally carried out in accordance with the following provisions. If the operating device is guaranteed to be in good working condition, its maintenance is allowed to be synchronized with chassis maintenance.

1. Daily maintenance

Daily maintenance is mainly clean, and the content is the same as Article 3 of the precautions in the use of garbage trucks.

2. Operation 100h maintenance

(1) Check the fastening bolts of the carriage, working device, shaft and other parts;

(2) Add grease or lubricating oil to each lubrication point on time;

(3) Check and tighten the connection bolts, joints and pipe hoses, pipe clamps, etc. of various parts of the hydraulic system, and check whether there is oil leakage;

(4) Check whether the force extractor works normally.

3. Operation 500h maintenance

(1) Whether the parts in each operating device have slight deformation, and if necessary, give correction;

(2) Check the wear of the sealing rubber strip and replace it if necessary;

(3) Check whether the hydraulic components can work normally, and should be disassembled or replaced if necessary. If there is oil leakage, the seal should be replaced;

4. Operation 1500h maintenance

Operation 1500h maintenance is a comprehensive technical inspection and adjustment of each operating device to eliminate hidden dangers.

(1) Check and repair welds everywhere, especially the welds of important parts;

(2) Check the wear and operation of the components of the device, and replace the wear and operation of the severe;

(3) Check the hydraulic components.

(4) Clean the hydraulic oil tank, the oil filter, the air filter and the hydraulic pipeline, and replace the hydraulic oil. Damaged seals and hoses should be replaced in time;


TAILOR-MADE

Special-purpose vehicle product customization services to meet customers' various customization requirements for special-purpose vehicle products.

Recommended Products

+86 18808668855
chenlei8855@gmail.com